Showing posts with label stone house. Show all posts
Showing posts with label stone house. Show all posts

Thursday, April 19, 2018

Abandoned House I

Today we had mixed precipitation coming down with the temperature at 41F (5C) and the wind chill making it feel like 30F (-1C) so I decided to stay home and finish this drawing that I have been working on for a very long time (see posts on 18 Jun 2013, 20 March and 29 July 2016, 14 January and 15 May 2017).

I started by putting in the tar paper on the roof of the building that was held in place with wood strapping.

From there I worked on putting the shadows on the stones that made up the front of the building.













Lastly, I put in the stones on the shadowed side of the building to complete my drawing.

This original 6" x 9” pen and ink drawing, when matted and shrink wrapped will be available for $50.00.

Thank you for taking the time to look at my artwork and I hope you will return often.

Monday, May 15, 2017

Abandoned House I - A Work in Progress

Today I have to go to P.R.H.C. and get the results of my bone density scan.

While I was waiting for Christine to come and take me to the hospital I thought I would like to do a little more work on this drawing that I had started a few years ago (see posts on 18 Jun 2013, 20 March and 29 July 2016 and 14 January 2017).















I started by putting in the mortar around the stones on the walls of the house.

As I finished indicating the last stone in the wall Christine arrived. I will post this drawing at a later date once I have inked in the stones.

Wednesday, January 25, 2017

Old Oak I and Lily Pond I - Two Works in Progress

Today isn't a very nice day with the temperature at 37F (3C) and the wind chill making it feel like 30F (-1C), but the worst thing is the mixed precipitation making everything cold and wet.

So I decided that I would do a little more work on a couple of sketches that I had started a long time ago (see posts on 22 February and 18 June 2013).
















Old Oak I

I started on the fence posts to the left of the oak tree first and once they were finished I added the grasses in some areas of the foreground.















Lily Pond I

From there I did a little work on the fence in front of the barn and decided that I needed to do a little more work on the drawing. I will post each of these drawings at a later date once more work on them has been completed.

Saturday, January 14, 2017

Abandoned House 1 - A Work in Progress

Today I wanted to do a little more work on this drawing that I started a number of years ago (see posts on 19 June 2013, 20 March and 29 July 2016).

I started with the windows on the shadowed side of the building first, putting in the window frames and then darkening the windows of the empty house.













Next I did the door frame and put the shadows on the door.

Lastly, I did the window frames on the front of the house and darkened in the windows.

I will post this drawing at a later date once I finish some of the stonework on the house.