Thursday, January 18, 2018

Old Cottage II - A Work in Progress

I pulled this drawing out that I started quite a while ago (see posts on 14 July 2013 and 31 May 2016) while at a paint out with the KAGS Outdoor Painters' Group.

After looking at the drawing I decided that I didn't want to put in the wheelbarrow leaning against the building and I put in the wooden boards across on that side of the building.

From there I added the grasses and growies at the base of the larger part of the building as well as putting the climber going up the side of the building.
















I put the shadows beneath the eaves on both sections of the building.

Next I darkened in the broken window on the smaller section of the building.

I will post this drawing at a later date once more work on it has been completed.