I started this sketch a number of years ago (see post on 13 July 2013) while on a paint out with the KAGS Outdoor Painters' Group.
On the front side of the building I put some shading under the eaves and then indicated the doorway.
I ran the remaining boards across the front of the building and started putting in some of the leaves from a climbing plant down the right side.
I extended the roof line and put in the rest of the tin roof.
Next I indicated one of the boards leaning against the side of the building and added a little bit of shading to the rain barrel.
I added more grass at the base of the building on each side of the doorway and to the left of the rain barrel.
I will post this drawing at a later date once more work on the building has been completed.
Thank you for coming to look at my artwork and I hope you will return often.
Friday, March 3, 2017
Old Shed I - A Work in Progress
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment