Even though it is a bright, sunny day with the temperature reaching 78F (25.6C), the welcome breeze kept away the humidity.
I pulled out this sketch that I started at a paint out a few years ago (see post on 14 July 2013) and I decided to do a little more work on the buildings.
Starting on the roof of the garage, I put on the shingles and then added some moss and dead leaves on top of the roof.
Next I added some siding onto the playhouse and onto the one side of the garage.
Lastly, I added some more growies and grasses to the base of the buildings.
I will post this drawing again once it has been completed.
Thank you for looking at my artwork.
Tuesday, May 31, 2016
Old Cottage II - A Work in Progress
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment